Stage one coastline work required for Dubai waterfront city project


Master developer Nakheel has floated a design and build tender for its Deira Islands project in Dubai.

The new 15.3kmwaterfront city, which will add 40km, including 21km of beachfront to Dubai’s coastline, is expected to contribute significantly to the government’s tourism vision.

All four Deira Islands will feature hotels, resorts and residential, commercial and retail units and will become a new cultural, residential and commercial hub for the Emirate.


Nakheel will master plan and complete infrastructure work ready for third party development on each island. The developer also plans to build five hotels of its own at the Islands.

The latest tender calls for the design and build for stage one of the coastline (the two near-shore islands).

The scope of works includes placing and profiling of up to nine new beaches, construction of new coastal structures (breakwaters, revetments and quay walls), limited land reclamation, and earthworks.

The deadline for submissions is 14 August, 2014.

This entry was posted in Thoughts. Bookmark the permalink.

Add a comment

Your email address will not be published. Required fields are marked *